Client
Major Corporate Law Firm
Location
Melbourne CBD
Completion
2026
Category
Corporate | Melbourne Projects

PROJECT OVERVIEW

Caterlink delivered a commercial kitchen and front-of-house café fit-out for major corporate law firm’s workplace in Melbourne’s CBD.
Appointed through a tender process, Caterlink was selected based on successful collaboration with the builder on previous projects and its ability to meet tight schedules.
Delivered over six months, the project required detailed planning and coordination across consultation, project management, equipment supply, installation and final fit-out.

PROJECT SCOPE

Caterlink provided:
• Consultation
• Project management
• Commercial kitchen equipment supply and installation
• Back-of-house preparation areas
• Back-of-house cooking areas
• Back-of-house refrigeration
• Front-of-house preparation areas
• Front-of-house display areas
• Front-of-house café

EQUIPMENT SUPPLIED

Major equipment brands included:
• MKN cooking equipment supplied by Phoeniks
• RATIONAL cooking equipment supplied by Comcater
• Scotsman ice machine
• Hoshizaki ice machine
• EcoCanopy ventilation
• MEIKO dishwashing equipment
The equipment package was selected to support food preparation, cooking, refrigeration, beverage service and warewashing across the back-of-house kitchen and front-of-house café.

PROJECT CHALLENGE
Working within a Melbourne CBD skyscraper presented several logistical constraints. Restrictions on noisy work, delivery times and site access limited the available windows for installation.
Caterlink coordinated equipment deliveries and installation with the project team to keep its work aligned with the construction schedule.

THE RESULT
The completed project provided an integrated commercial kitchen and café environment designed for the demands of a corporate workplace.
Despite the access and scheduling constraints, Caterlink completed its scope within the six-month project period. The result brings together coordinated back-of-house production areas, front-of-house preparation and display, refrigeration, ventilation and warewashing systems in one functional operation.

PROJECT TEAM
Designer: Sangster Design Group
Architect: Hassell
Builder: Buildcorp
Caterlink Project Manager: Johnny Nar
Caterlink Project and Sales Consultant: Ashi De Alwis